Aerospace and space operations look adjacent, but the scheduling model is different in kind. An aircraft's maintenance window can slip a day. A launch window is set by orbital mechanics, range availability and weather — and the four constraints below all follow from that one fact.
Equipment that arrives late, or arrives and does not fit, has the same effect as equipment that was never ordered.
Which is why a space programme's access equipment is specified against the integration schedule rather than the article alone — and why fit is validated before manufacture, not on the floor.
Each constraint above has a corresponding engineering response, and none of them is a scheduling promise — they are properties designed into the equipment.